T1 Report: Work Progress (SP)
The Task 1 "Work Progress (SP)" report relates the effort tracked per resource to the overall status of the activities within a given time period for a single project. It is intended to visualize what and how much was achieved. This report was developed by experienced project managers for use with Onepoint Project 8 Open, Network and Enterprise Edition
- Input parameters: Project, from date, to date
- Output columns: Date, activity, resource, plan (effort/hours), tracked (effort/hours), remaining (effort/hours), completed (boolean)
- Includes: Report package in ZIP format, installation instructions (README.TXT)
- Delivery: Report and installation instructions will be delivered via e-mail
- License: This report needs to be licensed per server
- Installation: Report must be copied into the "reportjars" folder of your Onepoint Project installation
- System Requirements: Onepoint Project 8 (Open, Network or Enterprise Edition)
- Note: Includes free upgrade to Onepoint Project 8.1 database schema (in case of schema changes)